Demolition

Required Submittals ----- Important: Applications with incomplete submittals will be delayed.

IMPORTANT: Electronic submittal document files are required to be named appropriately to ensure efficient permit processing. Review Naming Submittal Documents prior to starting ePermit process to ensure all files are labeled appropriately. See all related ePermit submittal and resubmittal requirements to help avoid delays in processing.

  • Application- Complete the Demo Application in its entirety and Upload
  • Township Approval Form - Use form to determine if township approval is required for project location.  Submit completed form with township approval signature if applicable.  
  • Survey/Detail Site Plans - details shall include:
    • Exact location and size of building/structure being demolished, other structures, and septic tanks/system
    • Distances to septic tanks/system and property lines

Build-Icon

Show All Answers

1. Addition (Commercial)
2. Accessory Dwelling Unit
3. Addition (Residential)
4. Basement Finish
5. Cell Tower
6. Change of Use
7. Deck
8. Demolition
9. Fence / Retaining Wall
10. Fire (Commercial)
11. Garage/Accessory Structure
12. Manufactured/Modular Home
13. Multi-Family
14. Non Residential New (Commercial)
15. Pole Building (Residential)
16. Remodel/Repair (Commercial)
17. Remodel/Repair (Residential)
18. Reroof/Siding
19. Residential 1 or 2 Family Home
20. Swimming Pool
21. Windows/Doors (In Existing Opening)