2022 Overlays

Project Details

  • Construction Year: 2022
  • Community: Throughout Scott County
  • Project Lead: Scott County
  • Contractor: McNamara Contracting, Inc.
  • Anticipated Completion Date: September 2022

Overlay Project (Updated 05/26/22)

CH 27: From CH 44 to South Park Drive 

  • Location: Savage 
  • Work Description: Work includes removing the top 3 inches of bituminous, utility replacement, paving the top 3 inches with new bituminous, seal coating, ADA retrofits, and sign replacements. 

CH 79: From CH 10 to TH 282 (Spring Lake and Sand Creek Townships)

  • Location: Spring Lake and Sand Creek Townships 
  • Work Description: Work includes removing all existing bituminous, aggregate base cement stabilization, paving with 5 inches of new bituminous, sealcoating, and sign replacements.  

CH 16: From 410 Feet East of Phillip Drive 

  • Location: Shakopee 
  • Work Description:  The proposed work for this project includes removing an existing left turn lane and replacing it with a new concrete median. Also, as part of a development commitment, Scott County agreed to remove an existing left turn lane and median crossing along CH 16.  

Purpose & Justification

This annual project is part of the Countywide pavement preservation program. Overlays are performed on a regular basis to preserve the initial paving investment and provide additional safety enhancements.  Please drive with caution.

  1. Jake Balk

    Construction Manager

  2. Highway Department


    Physical Address
    200 4th Ave W
    Shakopee, MN 55379

    Phone: 952-496-8346


Overlays Map

2022 Overlays