Highways 169 / 41 / 78 / 14                          Interchange Design Project

  • Construction Year: 2018
  • Community: Jackson Township, Louisville Township
  • Corridor Served:
    US Highway 169
    State Highway 41
    County Highway 78
    County Highway 14
  • Project Lead: Scott County
  • Partners: Mn/DOT, Jackson Township, Louisville Township

  

Description


Scott County and MnDOT are in final design for an interchange at US Highway 169 and Trunk Highway (TH) 41/County Highway (CH) 78.  Scott County was successful in obtaining federal funding to expand the scope of the project to include a proposed overpass over US 169 near CH 14 and extension of the frontage road system along the east side of US 169 between CH 78 and CH 14.  The expectation is to begin construction the end of 2018. 
  
MnDOT has concluded that an Environmental Impact Statement (EIS) is not required and has issued a Negative Declaration Order for the project.
 
Additional information including notices for upcoming public meetings on the project will be posted on this page as it becomes available.
 

Purpose & Justification


This project will improve the safety and mobility in this area by removing direct access to US Highway 169. This project is consistent with the long-term vision of converting this segment of US Highway 169 into a freeway.
 
This project will be funded in part by the Scott County Transportation Sales Tax.