CH 21 Extension EIS (2006)

Environmental review documents for the CH 21 Corridor Extension Project in Shakopee and Prior Lake.  Study of this corridor began in the 1990s and completed with the Environmental Impact Statement (EIS).  Construction began in 2009 and the road opened to traffic in 2011.